Step 1: Determine where to bolt the equipment
Accurately draw bolting pattern of the strut frame on the floor using one of the following methods:
Step 2: Install anchors
Install post-installed anchors as described in Anchors. Set the bottom frame in place. Apply nuts to the anchor/bolt and torque.
Step 3: Complete frame and plate assembly

Cap and strap should be considered for fiberglass tanks.
Step 4: Install additional anchors
Additional anchors may be installed in the wall for extra support. See Anchors or Masonry Anchors.
Tanks and gas cylinders may be attached.