Equipment should have pre-installed brackets that can support attachment to the building.


Cables provide horizontal restraint for seismic loads and should not be used to support the equipment weight.
Step 1: Attach the equipment to the building structure using threaded rods and anchors
Lay out all attachment points before anchoring. For building structure attachment details, see Figures 95-100. For instructions on bolting directly to the building structure, see Steel Bolt Connections.




For edge distances and spacing, see Lag Bolts


Use center load beam clamps for vertical loads. Do not use for cables, rods, or structural members positioned at an angle.


Step 2: Add rod stiffeners

Step 3: Attach anchors to the building structure for cable attachment
Figure 102 shows typical anchorage to different building construction. See Anchors.
Step 4: Attach cable to the building structure.
For cable assembly instructions, see Cables.
For details on attaching cable to the building structure.

Step 5: Attach cables to equipment
For details on attaching cable to the equipment, see Figure 103