More than four restrained springs may be required. See the manufacturer’s instructions.
Step 1: Determine where to bolt the equipment
Accurately draw the bolt pattern on the floor or pad using one of the following methods:
Step 2: Install anchors
Drill and install post-installed anchors or pour concrete with embedded studs or headed cast-in-place anchors.
Step 3: Set restrained spring isolators and bolt to anchors
Install restrained springs to building structure as shown in Figure 118. Attach nuts to the anchor. Use bolts for shell-type anchors or internally threaded wedge or chemical anchors. Torque as recommended by the anchor manufacturer.

BE CAREFUL NOT TO DAMAGE THE ANCHORS WHEN SETTING THE EQUIPMENT OR ISOLATOR.

Step 4: Move the equipment into place over the isolators
Use leveling nuts to level the equipment. Use attachment nuts to attach the base of the equipment to the isolator.
Figure 119 shows typical ways to connect the equipment to the restraints.