Crane Safety

  • Cranes and derricks are restricted from operating within 10 feet of any electrical power line.
  • The upper rotating structure supporting the boom and materials being handled is provided with an electrical ground while working near energized transmitter towers.
  • Rated load capacities, operating speed and instructions are posted and visible to the operator.
  • Cranes are equipped with a load chart.
  • The operator understands and uses the load chart.
  • The operator can determine the angle and length of the crane boom at all times.
  • Crane machinery and other rigging equipment is inspected daily prior to use to make sure that it is in good condition.
  • Accessible areas within the crane’s swing radius are barricaded.
  • Tag lines are used to prevent dangerous swing or spin of materials when raised or lowered by a crane or derrick.
  • Illustrations of hand signals to crane and derrick operators are posted on the job site.
  • The signal person uses correct signals for the crane operator to follow.
  • Crane outriggers are extended when required.
  • Crane platforms and walkways have antiskid surfaces.
  • Broken, worn or damaged wire rope is removed from service.
  • Guardrails, hand holds, and steps are provided for safe and easy access to and from all areas of the crane.
  • Load testing reports/certifications are available.
  • Tower crane mast bolts are properly torqued to the manufacturer’s specifications.
  • Overload limits are tested and correctly set.
  • The maximum acceptable load and the last test results are posted on the crane.
  • Initial and annual inspections of all hoisting and rigging equipment are performed and reports are maintained.
  • Only properly trained and qualified operators are allowed to work with hoisting and rigging equipment.
Scroll to Top