Site/Building Layout

Before foundation and footing excavation for a building can begin, the building lines must be laid out to determine the boundaries of the excavations. Points shown on the plot plan, such as building corners, are located at the site from a system of horizontal control points established by the battalion engineering aids. This system consists of a framework of stakes, driven pipes, or other markers located at points of known horizontal location. A point in the structure, such as a building corner, is located on the ground by reference to one or more nearby horizontal control points.

Scroll to Top