To apply for a waiver under § 107.200, an applicant must go to www.faa.gov/uas/ and follow the instructions.
Application Process. The application must contain a complete description of the proposed operation and a justification, including supporting data and documentation (as necessary), that establishes that the proposed operation can safely be conducted under the terms of a part 107 waiver. Although not required by part 107, the FAA encourages applicants to submit their application at least 90 days prior to the start of the proposed operation. The FAA will strive to complete review and adjudication of waivers within 90 days; however, the time required for the FAA to make a determination regarding waiver requests will vary based on the complexity of the request. The amount of data and analysis required as part of the application will be proportional to the specific relief that is requested. For example, a request to waive several sections of part 107 for an operation that takes place in a congested metropolitan area with heavy air traffic will likely require significantly more data and analysis than a request to waive a single section for an operation that takes place in a sparsely-populated area with minimal air traffic. If a part 107 waiver is granted, that certificate may include specific special provisions designed to ensure that the sUAS operation may be conducted as safely as one conducted under the provisions of part 107. A listing of standard special provisions for part 107 waivers will be available on the FAA’s Web site at http://www.faa.gov/uas/.