You require 70% or better to pass this quiz.
Quizzes can be repeated until a passing score is achieved.
0 of 10 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
1. True or False? The primary function of a bridge deck is to support the vehicular vertical loads and
distribute these loads to the steel structure.
True. The primary function of a bridge deck is to support the vehicular vertical loads and distribute these loads to the steel structure.
2. True or False? Reinforced concrete deck slabs are the most often used type of deck for steel
bridges.
True. Reinforced concrete deck slabs are the most often used type of deck for steel bridges.
3. The cantilever portion of the deck slab must be designed for?
Dead and live load moments for the strength and service limit.
4. What is the most common material for temporary formwork?
Permanent formwork, also referred to as stay-in-place formwork, can either be constructed from steel or concrete components, while temporary formwork typically consists of wood elements.
5. True or False? The Haunch in a steel bridge is the distance from the top of the steel girder web to the bottom of the concrete deck slab.
False
6. When were filled grid systems first introduced?
Filled grid systems were first introduced in the 1930’s
7. When were partially filled grid systems first used?
Partially filled grid systems were first introduced in the 1950’s.
8. True or False? A maximum coarse aggregate size of .375 in. is typically specified, and pencil type vibrations are recommended as the concrete is placed.
False
9. _______ steel deck consists of a flat, thin steel plate which is stiffened by a series of closely spaced longitudinal ribs that run parallel to traffic, placed orthogonal to transverse floor beams.
Orthotropic steel deck consists of a flat, thin steel plate which is stiffened by a series of closely spaced longitudinal ribs that run parallel to traffic, placed orthogonal to transverse floor beams.
10. Orthotropic steel decks are typically classified as?
Orthotropic steel decks are typically classified as either open-rib or closed-rib systems.