You require 70% or better to pass this quiz.
Quizzes can be repeated until a passing score is achieved.
0 of 10 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
1. Meter-mounted transfer switches shall __________ for emergency system use.?
not be permitted
2. What emergency power system can now be used as an emergency power source?
DC microgrid
3. Which of the following do not require a sign at the emergency disconnect of an on-site optional standby power source?
None of the above
4. An Energy Storage System (ESS) is defined as a system that?
Has a capacity greater than 1kWh
5. A nameplate for an ESS requires which of the following?
All of the above
6. The maximum voltage of an ESS shall be the rated ESS __________ indicated on the ESS nameplate(s) or system listing.?
input and output voltage(s)
7. Stand-alone systems can deliver power to?
Three-phase & single-phase systems
8. What is called an electrical ground reference for operational purposes that is not solidly grounded?
Grounded, Functionally
9. Regarding DC mircogrids on buildings, what is required on the building directory plaque located at service equipment locations?
Locations of DC disconnecting means
10. The fire alarm branch-circuit disconnecting means shall be permitted to be secured in the __________ position.
“on”
PAY AFTER YOU PASS! All Courses FREE to Take - Pay only for the Certificate Record Dismiss